E Bike Scheme 2025 – Apply Online, Eligibility Criteria & Latest Distribution Updates
The Government of Pakistan has officially launched the E Bike Scheme 2025, a major step toward promoting eco-friendly transportation and supporting students, employees, and low-income citizens. This scheme aims to distribute thousands of electric bikes (E-Bikes) at affordable installment plans, reducing fuel dependency and promoting sustainability across the country.
This latest update highlights the eligibility criteria, online application process, and the expected distribution timeline for the E Bike Scheme 2025 — an initiative that has become one of the most trending government programs this year.
Read More: BISP 8171 October 2025 – Check New Rs. 13,500 Payment Status Online by CNIC
What is the E Bike Scheme 2025?
The E Bike Latest Scheme 2025 is part of Pakistan’s Green Energy and Clean Mobility Program, launched under the Prime Minister’s vision to reduce carbon emissions and fuel costs. The scheme focuses on providing electric bikes to students, government employees, and low-income workers through easy installments and interest-free loans.
These bikes will be powered by rechargeable lithium-ion batteries, offering an affordable and sustainable alternative to traditional petrol bikes. The government has partnered with local manufacturers and banks to make the distribution smooth and transparent.
How to Apply Online for the E Bike Scheme 2025
Applying for the E Bike Scheme is simple and can be completed entirely online. The government has developed a dedicated E-Bike registration portal to ensure a transparent and digital process.
Follow these steps to apply for the E Bike Latest Scheme 2025:
-
Visit the official E-Bike Scheme Portal at ebike.gov.pk (official domain to be announced).
-
Click on “Apply Online” and fill out the registration form.
-
Enter your CNIC number, mobile number, and residential details.
-
Upload the required documents (CNIC copy, student card, or income proof).
-
Choose your preferred E-Bike model and payment plan.
-
Submit the form and wait for SMS confirmation from the Ministry of Industries & Production.
To apply for the E Bike Scheme 2025, visit the official portal, fill in your CNIC details, upload documents, and select your bike model. You’ll receive an SMS confirmation upon successful registration.
Eligibility Criteria for the E-Bike Scheme 2025
To ensure fairness and inclusivity, the government has set clear eligibility criteria for applicants. The E Bike Scheme is open to both male and female citizens who meet the following requirements:
-
Must be a Pakistani citizen with a valid CNIC.
-
Age limit: Between 18 and 45 years.
-
Must have a valid driving license (learner’s license accepted for students).
-
Priority given to students, female professionals, and low-income individuals.
-
Must not already own a registered vehicle.
The scheme gives preference to students of public universities, teachers, and government employees earning below Rs. 80,000 per month.
E Bike Scheme 2025 Installment Plan & Cost Details
The government has introduced subsidized payment plans to make E-Bikes accessible to everyone. The average cost of an electric bike is around Rs. 200,000, but the government will cover a 40% subsidy under the Green Mobility Initiative.
Installment Plan Example:
-
Down Payment: Rs. 40,000
-
Monthly Installment: Rs. 5,000 – Rs. 6,500
-
Duration: 3 Years
-
Interest Rate: 0% (Government-Funded Subsidy)
The installment plan will be managed through Bank of Punjab (BOP), Habib Bank (HBL), and Meezan Bank, ensuring secure and transparent financial handling.
E Bike Distribution & Balloting Schedule 2025
According to the latest government update, the E Bike Scheme balloting will take place in March 2025, with the first phase covering Punjab, Sindh, and KPK. The distribution of bikes will start in April 2025 through designated centers across major cities, including Lahore, Karachi, Islamabad, and Peshawar.
Applicants who are selected in the balloting will receive an SMS notification along with instructions to complete payment verification and bike collection.
🔹 Latest Update (October 2025): The Ministry of Industries has confirmed that over 25,000 E-Bikes will be distributed under Phase-I, with plans to expand to 100,000 units by the end of 2025.
Benefits of the E Bike Scheme 2025
The E Bike Scheme is more than just a financial support program — it’s a green revolution in Pakistan’s transport system.
Key Benefits Include:
-
Zero fuel cost – bikes run on rechargeable batteries.
-
Eco-friendly mobility – reduces carbon emissions.
-
Low maintenance costs compared to petrol bikes.
-
Ease of access for students and professionals.
-
Government-backed warranty and service support.
The scheme also promotes women’s empowerment, with a special quota for female students and working women who require affordable and safe transport options.
Documents Required for E Bike Scheme Registration
Before submitting your online application, make sure to prepare the following documents for upload:
-
CNIC (Front and Back)
-
Passport-size Photograph
-
Proof of Income / Student Card
-
Driving License / Learner’s Permit
-
Utility Bill (for address verification)
Incomplete or fake documents will lead to automatic disqualification from the scheme.
Final Words
The E Bike Scheme 2025 stands out as one of the most progressive and environment-friendly initiatives by the Pakistani government. With affordable installment plans, transparent registration, and massive subsidies, this scheme offers a golden opportunity for students, employees, and small business owners to switch to electric mobility.
If you haven’t applied yet — now is the time. Visit the official portal, register online, and become part of Pakistan’s green energy transformation.